Sectors · Data centres

The data room never stops. Not even for us.

MTP/MPO trunks, planned migrations, tier 1 and 2 certification: work happens with operations live, in agreed windows.

Data centre aisle with rack cabinets

In the data room there is no margin for error.

Growing density, polarity to respect, connectors that contaminate in an instant: in a data centre there is a lot of fibre and very little space. A patching mistake is not an inconvenience: it is a service going down.

That is why we plan every job in agreed windows, label every cable and certify every link — tier 1 with power meter, tier 2 with OTDR where needed. The room stays in operation; the documentation stays with you.

Sectors

An example, step by step.

context

A data room to cable without stopping operations.

intervention

Work in agreed windows, pre-terminated trunks.

outcome

Migration complete. Zero downtime.

Where to start.

MTP/MPO trunks

Installation and termination of high-density trunks, verified polarity, measured losses: ready for 40, 100 and 400 Gb.

Zero-downtime migrations

Plans built on agreed windows, dual paths and checks at every step: operations never notice the work.

Tier 1/2 certification

Power meter and OTDR, a report for every link, consistent labelling: the data room stays readable, today and in ten years.

Where we operate.

Corporate data rooms and data centres starting from Modena and Emilia-Romagna, across Northern Italy. Work in agreed windows, nights and holidays included, with our own personnel.

Other sectors

The first step

A site survey. Then the numbers.

Tell us the environment and the need; we tell you times, methods and costs. Before we start, not after.

30 minutes video call or site survey €150 free July promotion
Request an intervention

We reply within one business day. Survey and quote are free.